Open Access Research Article

Installation of Pit Fencing in Cramped Conditions

Sokolov NS*

Chuvash State University, Russia

Corresponding Author

Received Date: February 03, 2022  Published Date: March 04, 2022

Abstract

Construction of facilities in cramped conditions is always a complex geotechnical problem associated with ensuring the basal emergency operation of buildings and structures of the surrounding buildings. In the arsenal of geotechnicians, a great potential of geotechnical technologies for the installation of pit fences has been accumulated. Often, not everyone is suitable for the conditions of their use in cramped conditions. The most suitable technologies for such cases are the drilled wells used (wells for drill piles and soil anchors) with their subsequent filling with concrete and at the same time not disturbing the stress-strain state of the surrounding soil. The use of drilling piles and soil anchors arranged using electric discharge technology (ERT technology) in many cases successfully solves the problem of construction in cramped conditions. The article cites one of the geotechnical cases of fencing the pit in particularly cramped conditions. The work is an overview.

Keywords: Geotechnical construction; Electric discharge technology of ERT; Drill injection pile ERT; Soil anchors ERT

Citation
Signup for Newsletter
Scroll to Top