Open Access Mini Review Article

ERT Bored Injection Piles as Buried Building Structures

Sokolov NS*

Chuvash State University, Russia

Corresponding Author

Received Date:April 17, 2023;  Published Date: May 02, 2023

Abstract

The problem of increasing the bearing capacity of foundations is always an urgent task in modern geotechnical construction. It is of particular importance when building on slopes cut by ravines. As a rule, construction on slope surfaces due to the discharge of filtration flows in the form of springs is always a problematic measure. Hydrogeological processes often bring rugged surfaces intended for the construction of objects into an unstable state, leading them to landslides. Thus, the safe erection of buildings and structures in such areas is always accompanied by the simultaneous erection of retaining buried building structures. The most competitive retaining structures are monolithic reinforced concrete corner retaining walls erected on bored piles and fixed with ground anchors. The article gives examples of the use of ERT bored piles (RIT, FORST, ERST) and ERT ground anchors.

Keywords:Retaining recessed structures, geotechnical construction, EDT electric discharge technology, EDT bored pile, monolithic reinforced concrete grillage

Introduction

Modern capital construction for the most part is confined to areas heavily crossed by ravines and slopes [1-3]. As a rule, such construction sites are characterized and classified as unstable due to the fact that filtration flows are unloaded on their inclined surfaces. When static equilibrium is disturbed, filtration processes on slopes in most geotechnical cases lead [4-7] to flooding of construction pits, water saturation of engineering-geological elements that make up engineering-geological sections of the foundations of built-up objects. In the case of a qualified approach to the engineering preparation of the construction site in such conditions, it is possible to avoid negative factors. So, for example, in modern geotechnical practice, ERT (RIT, FORST, ERST) boredinjection piles are widely used as buried structures [8,9]. Their use in combination with ground anchors makes it possible to ensure the stability of slopes [10,11], including corner monolithic reinforced concrete retaining walls in their joint static work [11,12]. The article under consideration presents a number of successfully completed geotechnical objects on slopes in various regions of the Middle Volga region, carried out with the direct participation of the authors of the article.

Object Number 1

Monolithic reinforced concrete corner retaining wall as a recessed retaining structure on piles of bored-injection ERT (RIT, FORST, ERST) on the slope of Oksky congress in Nizhny Novgorod. The support was erected in connection with the expansion towards the slope of the right-side bank of the Oka River of two-way traffic into a one-way road. In connection with the placement of one strip directly on the slope, it became necessary to install four corner monolithic reinforced concrete retaining walls (see Figure 1a) on EDT bored piles (Figure 1b). The architectural elegance of the retaining walls can be observed from Komsomolskaya Square. All four retaining walls at their tops pour into one inclined straight line. Reliable operation of retaining walls indicates the correct choice of technical solution (Figure 1).

irispublishers-openaccess-civil-structural-engineering

Object Number 2

Tape pile field of ERT (RIT, FORST, ERST) drilled piles united by a monolithic reinforced concrete grillage as a buried retaining structure along Pozharskaya Street in Nizhny Novgorod (see Figures 2a and 2b). The need to erect such a building structure was caused in connection with the construction of a five-story hotel “Moscow”. It should be noted that initially there was a project for a pile field of bored piles with a diameter of d = 630.0 mm. Due to the impossibility of the tightness of the construction site, it was decided to switch to ERT bored injection piles (RIT, FORST, ERST). The hotel was commissioned more than five years ago, and no one has any questions about the reliable operation of the retaining wall (Figure 2).

irispublishers-openaccess-civil-structural-engineering

Object number 3

Buried retaining reinforced concrete structures using ERT bored piles (RIT, FORST, ERST), ERT ground anchors and monolithic reinforced concrete corner retaining walls in Cheboksary (see Figure 3). The need to design and install monolithic reinforced concrete corner retaining walls together with ERT bored piles (RIT, FORST, ERST) and ERT ground anchors arose in connection with horizontal movements of the leaning slope and deformations of the objects erected on it. Initially, a project was carried out for retaining structures of bored piles with a diameter of d = 630.0 mm in one row with the installation of a monolithic reinforced concrete strapping belt. When analyzing the causes of deformations, several flaws were revealed. Firstly, a single-row pile arrangement was used as buried structures, which is not acceptable from the point of view of maintaining the rigidity of the structure. Secondly, it is arranged only at the base of the slope. It was necessary to arrange the retaining building structures on the top of the slope. Thus, the use of ERT borehole piles (RIT, FORST, ERST) and ERT ground anchors in combination with monolithic reinforced concrete corner retaining walls at the site made it possible to ensure trouble-free operation of the leaning slope (Figure 3).

irispublishers-openaccess-civil-structural-engineering

Acknowledgement

None.

Conflict of Interest

No conflict of interest.

References

    1. Ilyichev VA, Mangushev RA, Nikiforova NS (2012) Experience in the development of the underground space of Russian megacities. Foundations and soil mechanics. 2: 17–20.
    2. Hassiotis S, Chamcau JL, Gunaratne M (1997) Design method for stabilization of slopes with piles. Journal of Geotechnical and Geoenvironmental Engineering 123(4): 314-323.
    3. Lee JH, Salgado R (1999) Determination of pile base resistance in sands. Journal of Geotechnical and Geoenvironmental Engineering 125(8): 673-683.
    4. Mandolini A, Russo G, Veggiani C (2005) Pile foundations: experimental investigations, analysis, and design. Ground Engineering 38(9): 34-38.
    5. Nikiforova NS (2011) Geotechnical cut-off diaphragms for built-up area protection in urban underground development. In: NS Nikiforova, DA Vnukov (Eds.) The pros, of the 7th I nt Symp, Geotechnical aspects of underground construction in soft ground, tc28 IS Roma, AGI, 2011, № 157NIK.
    6. Petrukhin VP (2003) Effect of geotechnical work on settlement of surrounding buildings at underground construction. In: VP Petrukhin, OA Shuljatjev, OA Mozgacheva (Eds.) Proceedings of the 13th European Conference on Soil Mechanics and Geotechnical Engineering, Prague.
    7. Triantafyllidis Th (2007) Impact of diaphragm wall construction on the stress state in soft ground and serviceability of adjacent foundations. In: Th Triantafyllidis, R Schafer (Eds.) Proceedings of the 14th European Conference on Soil Mechanics and Geotechnical Engineering, Madrid, Spain, pp.683-688.
    8. Sokolov NS (2016) Technological methods of arranging bored-injection piles with multi-place widenings. Housing construction, 10: 54.
    9. Sokolov NS, Sokolov SN, Sokolov AN (2023) Inconsistencies in the reliable operation of the cultural heritage object - the Chuvash Drama Theater named after K.V. Ivanova. Housing construction, 4: 70-75.
    10. Sokolov HS, Petrov MV, Ivanov VA (2014) Problems of calculation of bored-injection piles made using discharge-pulse technology. In: NS Sokolov (responsible editor), DL Kuzmin (responsible secretary), AN Plotnikov, LA Sakmarova, AG Lukin, et al. (Eds.) New in architecture, design of building structures and reconstruction. Materials of the VIII All-Russian (II International) Conference, pp.415-420.
    11. Sokolov NS, Sokolov AN, Sokolov SN, Glushkov VE, Glushkov AV (2017) Calculation of ERT bored injection piles of increased bearing capacity. Housing construction. 11: 20-25.
    12. Sokolov NS, Sokolov SN, Sokolov AN (2016) Experience in restoring the building of the Vvedensky Cathedral in the city of Cheboksary. Geotechnics 1: 60-65.