Open Access Research Article

Reduction of Garments Bottleneck Processing Time on the Sewing Line of the Garments Industries

Sazid Elahi1, Md Dulal Hosen2*, Farhana Jannat3, Nasrin Jamine3 and Syed Mahir Ali3

1Department of Apparel Engineering, Bangladesh University of Textiles, Dhaka, Bangladesh

2Department of Textile Engineering, Mawlana Bhashani Science and Technology University, Bangladesh

3Department of Apparel Merchandising & Management, BGMEA University of Fashion and Technology, Bangladesh

Corresponding Author

Received Date: April 10, 2020;  Published Date: May 11, 2020

Abstract

Operation management is one among the foremost powerful technique for deciding in production floor management and therefore the sewing stage is that the most vital and crucial stage in garment production floor, involves tons of operations having a special cycle times within the traditional sewing line of clothes , all of the workers aren’t equally expert to try to all the method . As a result, the problematic zones arise within the assembly line, which is typically referred to as the bottleneck workstation or operation. This study deals with bottleneck detection in sewing line. A bottle neck may be a point of congestion during a production system that happens when workloads arrive too quickly for the assembly process to handle, denotes as, rock bottom output point in assembly line. Reducing bottle neck is additionally related with increasing productivity it’s proven that with the assistance of various bottleneck elimination technique like line balancing, lean application technique, has been possible to spot non-value-added process and eliminate them from production process. During this paper, we’ve taken the assembly data of various apparel products like sport shirt and T-shirt. By applying lean technique, ensures maximum space utilization, inventory & transportation reduction and thus reduces cycle time & increases efficiency. The experimental results show significant improvement in productivity and line efficiency as compared to the prevailing system.

Keywords: Method Study; Lean; SMV; Improvement; Productivity

Introduction

Over the past 150 years, garment structures have changed from the manual fitting and assembly of individual hand sewn garments to mechanized, automated and sometimes robotized for batch production. Recently, to satisfy customer’s demands through the assembly of excellence garments product at lowest possible cost are the foremost focuses in RMG industry [1,2]. Appropriate planning or controlling system can contribute to understand better performance during this area. The assembly process of garments industry is often grouped into three main stages cutting, sewing and finishing. The stitching stage is that the foremost vital and crucial stage among them [3]. Sewing stages involves plenty of operations having a unique cycle time to perform within the traditional sewing line of garments, all of the workers aren’t equally expert to undertake to all or any the tactic [2]. As a result, the problematic zones arise within the mechanical system, which is usually remarked because the bottleneck workstation or operation [4]. Bottleneck is an operation having longer cycle time and where process goes slow within the stitching mechanical system. This process that have bottleneck problem, is that the main reason for reducing the efficiency of the assembly line. Line balancing is one quite technique for balancing the assembly line. At present, traditional production system possesses to urge replaced with assembly lines for greater product variability and shorter cycle time. The aim of this study is to unravel the bottleneck problem of sewing line during a garment manufacturing company [1]. The layout of the road was modified using the road balancing and time and examination technique. The world elimination of quotient on has greatly enhanced the opportunities for sourcing from Bangladesh.

Bangladesh supplies over US$28 billion worth of textiles and apparel to the world markets. And exports are growing rapidly as more and more buyers around the turn to India as an alternative to China. In 2005, spurred by the worldwide elimination of quotas shipments to the EU soared by 30% and people to the USA shot up by 34%. These increases are remarkable, as long as EU imports from all sources rose by only 8% while US import growth was just 6% [5]. Consumer spending is slowing down everywhere the planet. Retailers are trying to find real innovation from their suppliers. They want really new garments made from new fabrics and yarns. They want new services to offer their customers [6].

Competition within the late 1990’s are going to be supported the capabilities and core competences of textile and clothing companies and on the building of long-term supply relationships [7]. There are many opportunities to be addressed. Textile and clothing machinery will still be improved butt the foremost interesting technologies for the 2000s are within the areas of fibers, fabrics, measurement, control and multimedia. We can say an apparel industry is an independent industry from the essential requirement of staple to final products, with huge value addition at every stage of processing [8]. Apparel industry is of the total country export. The largest foreign exchange earning sector contributing 15% in this scenario, the Bangladeshi garment industries have witnessed substantial improvements in recent years. But the unnecessary capital investment isn’t getting to solve the matter entirely; moderately this may end up the waste in end of the day [9]. The aim of this study is to unravel the bottleneck problem of stitching line during a garment manufacturing company. For reducing bottleneck in apparel sewing line, different elimination techniques have been used [10]. Such as work sharing method, line balancing method, implementation of lean. We reveal that how above-mentioned techniques can be integrated to show a best picture of non-valueadded activities present in the system and, hereby eliminating the problem that causes bottleneck.

Materials and Methods

Materials

In this Research was conducted in a selected garment located in Tongi, Gazipur, Bangladesh. Here quantitative data used for the analysis of this research. The collected data tabled the data firstly in accordance with traditional operation break down then according to work sharing method and then Lean line operational break down. Finally, the results are compared with the help of Time study, Bar chart, Histogram etc. In this research some very normal materials are used to carry out the data collection and analysis. Those materials are:-

1. Statistical data

2. Foreign Trade Source

3. Paper

4. Pencil

5. Calculator

6. Pen

7. Scale and

8. Stop watch etc.

Methods

The following Line Balancing Techniques are being used in this research:-

• Method Improvement

• Share Capacity

• Add Additional Manpower or Machine

• Improve Workstation Layout

• Better Operator

• Work for Extra Hours

• Use Time Saving Tricks

• Reduce Bottleneck by Work Sharing Method

At first, a stitching line of t-shirts was chosen for balancing and required information was gathered from the road like number of operator and helper, cycle time, target, and SMV. Then we took the time of every process needed for the completion of every worker. Then we found out the bottleneck area. At the numbers 6, 10, 12, and 17 operators, the capacity was above the previous operators, thus, add process was high there. Two operators were reduced from the operation hem sleeve and attached sleeve to body and the number 6 operation was shared with number 5. Moreover, number 17 was removed and shared with the number 18 operator. Therefore, the work process development of line balancing is done by this flow process:-

irispublishers-openaccess-textile-science-fashion

Results and Discussions

Experimental data (Before work-sharing)

It is clear from the graph that in the 6, 10, 12, and 17 number operations, the bottleneck which occurred at those points’ capacity was higher than the previous operation (Figure 1 & Table 1).

irispublishers-openaccess-textile-science-fashion

Table 1:Capacity study based pitched diagram.

irispublishers-openaccess-textile-science-fashion

Efficiency Calculation before Work-Sharing:

Given that,

Manpower = 23

Working hour = 10

Actual Output = 1380/10 hour

SMV = 5.50

irispublishers-openaccess-textile-science-fashion-science
irispublishers-openaccess-textile-science-fashion

Table 2:Capacity study after work-sharing.

irispublishers-openaccess-textile-science-fashion

Efficiency Calculation after Work-Sharing:

Given that,

Manpower = 19

Working hour = 10

Actual line output = 1600/10 hour

SMV = 5.50

irispublishers-openaccess-textile-science-fashion-science
Reduction of bottleneck by lean application

Here, used time study to balance these sewing lines which is a part of work study. It implements the use of SMV calculation to identify the points where production has gone below the standard level and the places where the production is above the standard. Then it is balanced to remove bottle neck in order to increase productivity. This system was effective and helpful. Considerable improvement observed by using time study as a line balancing technique changing form traditional layout to balanced layout model. The exchanges of work between the operator & helper caused a significant change in line results of reducing wastage of time, minimum no. of worker and which caused high productivity in the manufacturing process. This balancing process also leads to increased output per day, labor productivity, machine productivity and overall line efficiency. The overall results relay on maximum profit of the company with effective use of its available resources. Our efforts and analysis say it is an effective method that helps to increase productivity. It is easy and can be applied in a simple way. But to sustain in the competitive market we need to gear more productivity. Here lean can help us to get the right results as it has some more potential tools and systems (Table 3 & Table 4).

Table 3:Traditional operational break-down (Style Name : Polo Shirt).

irispublishers-openaccess-textile-science-fashion

Table 4:Lean line operational break-down (Style Name : Polo Shirt).

irispublishers-openaccess-textile-science-fashion

irispublishers-openaccess-textile-science-fashion-science
irispublishers-openaccess-textile-science-fashion-science
irispublishers-openaccess-textile-science-fashion-science
irispublishers-openaccess-textile-science-fashion-science
Transportation analysis traditional line vs. lean line

(Table 5 and Figure 3)

Table 5:Transportation analysis traditional line vs. lean line.

irispublishers-openaccess-textile-science-fashion

irispublishers-openaccess-textile-science-fashion
Inventory analysis traditional line vs. lean line

Lean manufacturing emphasizes the importance of reducing inventory, since it is considered to hide productivity problems caused by unwanted variation and complicated set up procedures (Table 6 & Figure 4).

Table 6:Inventory analysis traditional line vs. lean line.

irispublishers-openaccess-textile-science-fashion

irispublishers-openaccess-textile-science-fashion
Space utilization analysis traditional line vs. lean line

Table 7:Space utilization analysis traditional line vs. lean line.

irispublishers-openaccess-textile-science-fashion

Implementing lean in production system ensures maximum space utilization and thus reduces cycle time & increases efficiency (Table 7 & Figure 5).

irispublishers-openaccess-textile-science-fashion
Work procedures at stations analysis traditional line vs. Lean line

The work at the stations in the factory will to high extent be influenced by the implementation of lean. Some procedures will probably have to be changed and improved, and it is therefore necessary to map the current work at the stations. Standardization, material handling, visualization and environment are investigated in this area (Table 8 & Figure 6).

Table 8:Work procedures at stations analysis traditional line vs. Lean line.

irispublishers-openaccess-textile-science-fashion

irispublishers-openaccess-textile-science-fashion
Different types of defects analysis traditional line vs. lean line

Poor quality and the resulting defects are a major source of cost for many companies. This is also a cost that is often under reported as there are direct and indirect effects of defects. A defect is any error in a process that makes a product or service less valuable (Table 9 & Figure 7).

Table 9:Different types of defects analysis traditional Line vs. Lean line.

irispublishers-openaccess-textile-science-fashion

irispublishers-openaccess-textile-science-fashion
Discussion of finding

(Table 10 &11)

Table 10:Comparing key productivity indicator for polo-shirt.

irispublishers-openaccess-textile-science-fashion

Table 11:Productivity analysis for polo-shirt.

irispublishers-openaccess-textile-science-fashion

Conclusion

Bottleneck reduction is an important issue in RMG sector. Because it is related with productivity improvement. The profit earning of apparel industry largely depends on productivity improvement. This study shows the way of improving the production efficiency by bottleneck reduction. Number of operators is reduced by considering process wise cycle time per head. A final layout for the finishing line is proposed. The proposed layout model has been followed the logic of modular system (worker works on more than two processes who is skilled on all processes and these combination of skilled workers finish their work in piece flow production) and traditional system (one worker works in one process and all the workers who may be skilled or not finish their work in bundle flow production) both together where only modular production system can be applicable with a series of skilled workers to achieve more productivity. This calculation could be justified by considering different line of the production floor. Result would have been more effective if the order considered is larger than the current order. Bottleneck reduction techniques are very important for reducing production time and improving quality.

Acknowledgement

None.

Conflict of Interest

None.

irispublishers-openaccess-textile-science-fashion

References

  1. Haque MT, Hossain MR (2018) Bottleneck problem reduction of a garment manufacturing industry in Bangladesh by using line balancing technique. International Journal of Research in Advanced Engineering and Technology 4(2): 28-32.
  2. Vilà M, Pereira J (2013) An enumeration procedure for the assembly line balancing problem based on branching by non-decreasing idle time, European Journal of Operational Research 229(1): 106-113.
  3. Jayakumar AA, Krishnaraj C, Kumar AA (2017) Productivity improvement in stitching section of a garment manufacturing. International Journal of Innovative Research in Advanced Engineering 12(4):8-11.
  4. Güner MG, Ünal C (2008) Line balancing in the apparel industry using simulation techniques, Fibres & Textiles in Eastern Europe 16(2): 75-78.
  5. Kishore VR, Rao YS (2018) A review of optimization techniques implementation in production industries. International Journal of Engineering and Techniques 4(1).
  6. Marudhamuthu R, Krishnaswamy M, Pillai DM (2011) The Development and Implementation of Lean Manufacturing Techniques in Indian garment Industry,Jordan Journal of Mechanical and Industrial Engineering 5(6): 527-532.
  7. Suman S (2018) Project report on achieving quick changeover through smed implementation at Laguna clothing Pvt. Ltd., Kanakapura.
  8. Marudhamuthu R, Krishnaswamy M (2011) The development of green environment through lean implementation in a garment industry. ARPN Journal of Engineering and Applied Sciences 6(9): 104-111.
  9. Bappy MM, Musa MA, Hossain MF (2019) Productivity improvement through line balancing-a case study in an apparel industry 7(2): 893-902.
  10. Alauddin Md (2018) Process improvement in sewing section of a garments factory - A case study.
Citation
Keywords
Signup for Newsletter